There are more and more users of LED transparent screens, and some users do not know much about the installation method of LED transparent screens. Today, the editor here will introduce the installation skills of LED transparent screens:
the
The following are the tips for installing LED transparent screens:
the
1. Install the crane beam. Select the crane girder that needs to be installed, and keep the level between the two crane girders.
the
2. The LED transparent screen transparent screen box is connected with the hanging beam. According to the designed hole position, connect the box body with the hanging beam and lock it with a locking buckle. It can also be locked with a connector to securely attach it to the lifting beam.
the
3. The left and right rows of boxes are connected. This is also related to the corresponding latch, very simple.
the
4. The upper box and the lower box are connected together. The locking buckle can easily align and lock the upper and lower boxes through the positioning holes.
the
5. The line connection between the boxes. After the boxes are connected, connect the lines between the boxes, and connect the corresponding upper and lower data lines and power lines through aviation connectors.
the
6. External power cord. By using special terminal connectors, the live, neutral and ground wires of the power cord are connected correctly. Depending on the number of columns, several external power cables are used for several columns, which can be connected from the top or bottom, depending on the actual needs.
the
7. External network cable Connect one end of the network cable to the processor and the other end to the screen.
the
8. The box is connected to the network cable. The head of a row of boxes is connected to the network cable, and a network cable is needed to connect two rows of boxes from the other end. The whole connection trend is N-type.
Contact Person: Xingjun Li
WhatsApp: +8615977346663